Project Details
Musandam Gas Plant (MGP) project is located on the west coast of the Musandam Province in the Sultanate of Oman. The project was developed by Oman Oil Company Exploration & Production LLC (OOCEP) to process well fluids from the existing West Bukha field located close by in Omani waters. Well fluids are transported from the offshore platform to MGP via a subsea pipeline.
The plant produces sales quality gas, oil, LPG and Sulphur, and treats effluents to minimize any environmental impact.
OOCEP is ploughing around US$600 million in the development of the Musandam Gas Plant project. The project involves the construction of an onshore processing unit at Musandam, which will then be connected to the offshore West Bukha field.
Source: negEdge
Projects
SPECIFIC MILESTONES
RubyBuild Constructios
Mirum est notare quam littera gothica, quam nunc seacula quarta decima etquinta decima. Eodemod typi non habent clari-tatem. We aim to eliminate company that offers design and build.
Donec varius sodales orci. Class aptent taciti socio citi sociosqu ad litora torquent per nostra, per ince varius a sodales orci.
Mirum est notare quam littera gothica, quam nunc putamus paru decima etquinta decima. Eodem modo typi, qui nunc nobis viden We aim to eliminate the task of dividing.
Mirum est notare quam littera gothica, quam nunc putamus paru decima etquinta decima. Eodem modo typi, qui nunc nobis viden We aim to eliminate the task of dividing.
Mirum est notare quam littera gothica, quam nunc putamus paru decima etquinta decima. Eodem modo typi, qui nunc nobis viden We aim to eliminate the task of dividing.
Mirum est notare quam littera gothica, quam nunc putamus paru decima etquinta decima. Eodem modo typi, qui nunc nobis viden We aim to eliminate the task of dividing.
Al Nahdha Overseas provided turnkey solutions to various contractors for the Musandam Gas Plant Project which as follows:
Clients | Scope of Work | Job Duration | Approx Job Value (USD) |
Hyundai Engineering |
Blasting & Painting of Fabricated Pipe Spools, Straight Pipes, Fittings with the System A1-A4, A1-A3, C1-C3,C1-C2 | 36 Months | 948,051 |
Supply of scaffolding Materials, Erection/Dismantling of Suspended Scaffolding and tagging for Structure, Equipment | 18 Months | 3,896,103 | |
Supply of scaffolding Materials, Erection/Dismantling of Suspended, Cantilever, Tower Scaffolding and tagging at various height for Structure, Equipment, column, Vessel, Pipe Line | |||
Supply of scaffolding Materials, Erection/Dismantling of Tower , Cantilever Scaffolding and tagging at various height for Storage Tank | |||
Supply and Application of Hot Insulation (Mineral wool) & Cladding, PP Insulation, Acoustic Insulation on Equipment | 18 Months | 3,896,103 | |
Application of Hot/Cold/PP/Cryogenic Insulation &Cladding on Pipe Line | |||
Rental of Equipments (Crane, Bobcat, Generators, Tower Light, Hiab, Water Tanker, Forklift, Manlift, Hydro Carbon Tanker, Boom Truck, Prime Mover, Kneel Bed Trailer, Welding Machine) |
36 Months | 6,054,148 | |
Rental of Equipments (Crane, Bobcat, Generators, Tower Light, Hiab, Water Tanker, Forklift, Manlift, Hydro Carbon Tanker, Boom Truck, Prime Mover, Kneel Bed Trailer, Welding Machine) |
24 Months | 1,639,649 | |
Total Value | 16,434,054 |